Construction Dumpster Rental in New Braunfels, TX

Construction jobs produce debris faster than any other project type. A single framing phase on a 2,500 square foot build fills a container before the crew finishes the week. We deliver roll off dumpsters from 10 to 40 yards to job sites across New Braunfels, with flat rate pricing, same day delivery on most orders, and swap outs scheduled around your build calendar. Call (830) 381-6680 to set up delivery.

Construction job site in New Braunfels using a roll off dumpster rental

What Size Dumpster Do You Need for a Construction Site?

For most residential construction work in New Braunfels, a 20 or 30 yard container is the right call. Use a 20 yard for single phase work like a room addition or interior remodel. Use a 30 yard for new builds, full gut jobs, and framing debris on homes under 2,500 square feet.

Two exceptions matter:

A rough planning number from the industry: a typical residential renovation produces 2 to 5 tons of waste, and new construction generates upward of 10 tons per 1,000 square feet of building. Tell us your square footage and phase when you call and we will size it against those numbers instead of guessing.

Sizing by Construction Phase

Most sizing guides treat a build as one job. On an active site it is three or four separate waste streams, and each one behaves differently in a container.

Demolition and site prep. This is the heaviest phase. Old concrete, tile, plaster, and removed footings load dense and fast. A 10 or 15 yard container filled completely beats a large container filled a third of the way, both on cost and on hauling safety.

Framing and rough in. Lumber offcuts, sheathing scrap, packaging, and wire spool waste are bulky and light. This is where a 30 or 40 yard earns its price, because you are buying space rather than weight allowance.

Drywall and finishing. Gypsum board scrap, trim, flooring waste, and cabinetry packaging fill volume steadily. A 20 or 30 yard usually covers this phase, and it is the point where most contractors schedule their first swap.

Final cleanup. Mixed debris, protective sheeting, and jobsite trash. A 20 yard is typically enough, though builds that ran long often need a second haul because material accumulated in corners of the site.

Build PhaseTypical DebrisDensityContainer Size
Demolition & Site PrepConcrete, tile, plaster, old footingsHeavy10 or 15 yard
Framing & Rough InLumber offcuts, sheathing, packagingLight and bulky30 or 40 yard
Drywall & FinishingGypsum scrap, trim, flooring, cabinetryModerate20 or 30 yard
Final CleanupMixed debris, sheeting, jobsite trashMixed20 yard

Planning size by phase instead of by project keeps your crew from stacking debris on the ground between hauls, which is where jobsite injuries and city complaints usually start. OSHA housekeeping rules for construction sites require scrap and debris to be cleared from work areas and removed at regular intervals, so container timing is a compliance question as much as a convenience one.

Construction debris cleared for removal at a Comal County build site

What Goes In, and What Stays Out

Standard construction and demolition debris we accept: lumber, framing scrap, plywood and sheathing, drywall and plaster, roofing shingles and underlayment, siding, windows and doors, flooring, tile, carpet, cabinetry, fixtures, millwork, insulation, packaging, and general jobsite trash. Concrete, brick, and masonry are accepted in a container sized for weight.

What cannot go in any container: wet paint, solvents, adhesives and sealants, asbestos containing material of any kind, batteries, tires, pressurized cylinders, refrigerants and appliances that still contain them, fuel, oil, and other liquid waste.

Contaminated loads get refused at the scale, which means a return trip and a fee. If you are unsure about a material, call before it goes in the container. For material streams that can be diverted instead of landfilled, the EPA guide to construction and demolition materials covers what typically gets recovered.

Built for Contractors: Swaps, Scheduling, and Multi Phase Jobs

General contractors and subcontractors working across New Braunfels use us differently than homeowners do. A homeowner rents once. A builder needs a container that keeps pace with a schedule.

Delivery Across New Braunfels and Comal County

We deliver construction containers to job sites throughout New Braunfels, including active development areas near Vintage Oaks, Copper Ridge, and Veramendi, commercial work along the Loop 337 corridor, and builds off Highway 46 and FM 306. We also serve Seguin, San Marcos, Spring Branch, Canyon Lake, Bulverde, Garden Ridge, Schertz, Selma, and Boerne.

Standard rental runs 7 to 10 days with flat rate pricing covering delivery, pickup, and disposal. Longer builds can hold the container on an extended rate, arranged before the scheduled pickup date.

If a container needs to sit on a public street or right of way rather than on the lot, confirm current requirements with the City of New Braunfels before delivery day.

Common Questions About Construction Dumpster Rental

Common Questions About Construction Dumpster Rental

A 20 or 30 yard container covers most residential construction in New Braunfels. Choose a 10 or 15 yard for concrete, dirt, and other heavy material, and a 40 yard for high volume light debris like framing scrap and packaging.

Call (830) 381-6680 With Your Build Schedule

We will recommend the container size, set the delivery window, and put your swaps on the calendar.